01 · Power

Substations, lines and cables up to 380 kV

We build substations, overhead lines and underground cables for Saudi Energy, the National Grid and the Kingdom's giga-projects, and our service division tests, joints and maintains them.

Power at a glance

57 power contracts for the Kingdom's transmission grid

49 of them for Saudi Energy, and 21 awarded in 2025–26.

+50EHV & HV substations
+2,000 kmoverhead transmission lines
+1,000 kmunderground cables
380 kVhighest voltage, AIS and GIS

Current contracts by work type

Substations23
Overhead lines16
Underground cables16
Synchronous condensers2

Contracts by status

Contract period ended19
Under execution17
Awarded 2025–2621

Source: TDP projects list, October 2026.

380/132/33/13.8 kV · AIS and GIS

Complete substations, from civil works to energization

We build bulk supply points and transmission substations on a turnkey basis: civil and building works, GIS and AIS equipment, power transformers, protection, SCADA and telecom, then testing and commissioning.

Our scope also covers extensions, upgrades and auxiliary systems for operating substations.

  • +50 EHV & HV substations
  • 380 kV highest voltage
  • 10 new substations awarded in 2025–26
GIS hall
Power transformer bay
Substation control and protection panels

Selected substation projects

ProjectClientPeriod
New Al Qirah 380 kV BSP Saudi Energy 2025–27
Busaita 380/132/13.8 kV BSP Saudi Energy 2024–27
Baida Nathel BSP Saudi Energy 2026–28
Mawqaq PSP 9057 BSP Saudi Energy 2025–27
National Information Center 380/132/13.8 kV #9103 (SDAIA) Saudi Energy 2026–29
Samaha 380 kV Saudi Energy 2025–27
Al-Baian S/S 9097 Saudi Energy 2021–26
Busaita B & C 132/33 kV Saudi Energy 2026–28
Qiddiya SS 8370 & 8373 Qiddiya Investment Company 2023–26
West Mahasen Saudi Energy 2023–25
Dammam–Khobar 230 kV Saudi Energy 2022–25
MoD Housing Project, Jizan Ministry of Defense 2021–23
Tower erection crew working at height
Route survey
Conductor drums ready for stringing

132 kV · 230 kV · 380 kV

Lines that carry power across the Kingdom

Single- and double-circuit overhead lines through desert, sabkha and mountain terrain, with our own survey teams, piling rigs, cranes and stringing crews.

  • Route survey and access roads
  • Bored-pile and pad foundations
  • Tower assembly and crane erection
  • Conductor and OPGW stringing
  • Insulators, fittings and earthing
  • Line relocation and uprating
  • Loop-in / loop-out to new substations
  • Testing, energization and maintenance

Selected overhead line projects

ProjectClientPeriodLength
Al Ula OHTL 02 Saudi Energy 2024–27 262 km
Busaita 380 kV Saudi Energy 2024–27 232 km
Salwa Saudi Energy 2024–27 172 km
Wadi Aldwasir Saudi Energy 2026–29 123 km
Busaita 132 kV B & C Saudi Energy 2026–27 121 km
New Shaqra Saudi Energy 2024–26 98 km
Qiddiya 9078 – Al Jillah 9063 Qiddiya Investment Company 2023–26 97 km
Ramah Saudi Energy 2025–27 97 km
Starah Saudi Energy 2026–29 63 km
Riyadh East 380 kV reinforcement Saudi Energy 2026–28 28 km

13.8 kV to 380 kV XLPE

Extra-high-voltage cables beneath the Kingdom's busiest roads

We install cable circuits in dense city corridors where traffic, utilities and residents must keep moving, and replace ageing oil-filled cables with XLPE.

  • Open-cut trenches and duct banks
  • Cable tunnels and cable basements
  • Cable pulling and laying
  • Link boxes, bonding and earthing
  • EHV joints, GIS and outdoor terminations
  • LPOF to XLPE replacement
  • Fibre optic and telecom links
  • Road and pavement reinstatement
Cable tunnel
Cable pulling
Cables laid in trench

Selected underground cable projects

ProjectClientPeriodLength
Qiddiya SS 8370–8373 UG Qiddiya Investment Company 2023–26 166 km
380 kV Line MBS4 Saudi Energy 2021–26 92 km
380 kV Line MBS2 Saudi Energy 2021–27 79 km
Al Ula Saudi Energy 2024–26 40 km
Rames and Rabia BSP Saudi Energy 2026–27 32 km
Ramees Saudi Energy 2024–26 27 km
Expo 2030 (two contracts) Saudi Energy 2026–28 23 km
Al Nazeem 8271 Saudi Energy 2023–26 19 km

Earlier references: 380 kV cables BSP 9050–9024 and BSP 9051–9020.

Renewables & grid stability

Connecting the Kingdom's new wind and solar plants

Our grid works cover nine renewable energy projects, including 380 kV collector substations and synchronous condensers that keep the grid stable as more wind and solar power comes online.

  • Mozeraah Wind 380/33 kV BSP
  • Nifi Wind 380 kV BSP #9124
  • East Al-Amoah PV + BESS 380/33 kV BSP
  • Synchronous condenser, Namria Wind · 132 kV
  • Synchronous condenser, Mawqaq PV · 132 kV
Wind farm in the Kingdom

Power services

Testing, jointing and maintenance by our own service division

+500 service workforce, +50 certified personnel, +10,000 joints and terminations, and three EHV testing vehicles.

Explore power services

Let's build together

Planning a power or infrastructure project?

Talk to our team about substations, transmission lines, cables, roads, testing and maintenance, or equipment supply.