02 · Roads & Infrastructure

+500 km of roads and +60 bridges in three years

Highways, bridges, earthworks and utilities for the Ministry of Transport, municipalities, MAWANI, NEOM and Ma'aden, supported by our own machinery division.

+20projects delivered on time, last 3 years
+500 kmof roads built
+60bridges
+15 M m³of earthworks

Roads & bridges

Roads and bridges under construction

ProjectClientKey quantitiesPeriod
Jeddah Islamic Port – Al-Khumrah logistics road MAWANI 36 km · 24 bridges · 820,000 t asphalt —
Makhwah–Majardah–Mahayel road, Makkah Region Ministry of Transport ~100 km · 21 bridges · 184 culverts —
Jeddah roads maintenance and improvement Jeddah Municipality 1.16 M t asphalt · 140,000 m curbs —
Urban Scene Development (Model Road Axis) Asir Municipality ~45 km · 1 bridge · 450,000 trees —
Al Baha Ring Road Ministry of Transport 9 km · 4 bridges —
Riyadh region roads, Group 30 Ministry of Transport 39 km · 2 bridges —

Completed for the Ministry of Transport

  • Al-Sail Al-Kabeer – Riyadh Road, Taif (46 km · 4 bridges)
  • Bisha / Rania / Al-Khurma road (35 km · 6 bridges)
  • Riyadh / Al-Rain / Bisha road (35 km)
  • King Khalid University roads, Asir (14 km)
  • Military City intersection, Asir
  • Asir roads, Group 17 (4 bridges)
Al Baha Ring Road, bridge deck girders

Wadi Raghdan Bridge, Al Baha: 60% of the ring-road value, completed in 8 months of a 48-month programme.

Earthworks, utilities & landscape

Moving millions of cubic metres, on schedule

Oxagon Highway 55 earthworks
NEOM

Oxagon Highway 55 upgrade

About 3 million m³ of excavation and embankment, 3 km of HDPE pipeline, 15 chambers, rip-rap, testing and commissioning.

Ma'aden tailings storage facility
Ma'aden

Tailings storage facilities

1.5 million m³ of earthworks with clearance, trimming, rip-rap, piezometers, spillway and geotextile works.

Asir model road axis, landscape works
Asir Municipality

Urban Scene Development, Asir

About 45 km of road with retaining walls, 120,000 m² of shotcrete, 154,000 m of curbstones and around 450,000 trees.

Geosynthetics & lining

Lining for mining, energy and the environment

TDP installs and tests HDPE, GCL and geotextile lining systems with trained welding crews and full seam testing. +60 million m² of liner installed in Saudi Arabia and the Gulf.

  • Mining: Ma'aden heap leach pads and tailings at Bulgha, Sukaybarath, Al Amar, Mahad Ad'Dahab, As Suq, Mansoura Massarah, Ad Duwayhi
  • Oil & gas: Saudi Aramco gas plants at Haradh, Khurais, Wasit and Shaybah NGL
  • Landfills: Jeddah, Madinah, Qassim, Jubail and Ras Al-Khair (Royal Commission), Sharjah
  • Water & leisure: Riyadh artificial lake, Princess Sabeeka Park lake (Bahrain), golf courses, Ras Abu Fontas desalination (Qatar)
Mining heap leach pad lining
Wedge welding of HDPE liner
Riyadh artificial lake

Let's build together

Building roads, bridges or earthworks?

Talk to our team about substations, transmission lines, cables, roads, testing and maintenance, or equipment supply.