Oxagon Highway 55 upgrade
About 3 million m³ of excavation and embankment, 3 km of HDPE pipeline, 15 chambers, rip-rap, testing and commissioning.

02 · Roads & Infrastructure
Highways, bridges, earthworks and utilities for the Ministry of Transport, municipalities, MAWANI, NEOM and Ma'aden, supported by our own machinery division.



Roads & bridges
| Project | Client | Key quantities | Period |
|---|---|---|---|
| Jeddah Islamic Port – Al-Khumrah logistics road | MAWANI | 36 km · 24 bridges · 820,000 t asphalt | — |
| Makhwah–Majardah–Mahayel road, Makkah Region | Ministry of Transport | ~100 km · 21 bridges · 184 culverts | — |
| Jeddah roads maintenance and improvement | Jeddah Municipality | 1.16 M t asphalt · 140,000 m curbs | — |
| Urban Scene Development (Model Road Axis) | Asir Municipality | ~45 km · 1 bridge · 450,000 trees | — |
| Al Baha Ring Road | Ministry of Transport | 9 km · 4 bridges | — |
| Riyadh region roads, Group 30 | Ministry of Transport | 39 km · 2 bridges | — |

Wadi Raghdan Bridge, Al Baha: 60% of the ring-road value, completed in 8 months of a 48-month programme.
Earthworks, utilities & landscape

About 3 million m³ of excavation and embankment, 3 km of HDPE pipeline, 15 chambers, rip-rap, testing and commissioning.

1.5 million m³ of earthworks with clearance, trimming, rip-rap, piezometers, spillway and geotextile works.

About 45 km of road with retaining walls, 120,000 m² of shotcrete, 154,000 m of curbstones and around 450,000 trees.
Geosynthetics & lining
TDP installs and tests HDPE, GCL and geotextile lining systems with trained welding crews and full seam testing. +60 million m² of liner installed in Saudi Arabia and the Gulf.